“CFP was part of what made ANWB Business Services the best partner that ANWB has”
Erik de Jonge, Manager
Business Services ANWB

Cost savings of over 1 million Euros
ANWB
- CFP Service: Management, Cost reduction
- Period: 2008-2009
Erik de Jonge, Business Services Manager: "CFP helped ensure that ANWB Business Services has become the best partner for ANWB. Thanks to joint project teams and specific expertise, the project was a huge success".
Results
A cost savings of over 1 million Euros was generated, and the customer satisfaction score increased to 7.2.
Case
Together with ANWB, CFP first performed a benchmark test. The results of the test showed that costs could be saved and quality could be improved in a number of areas. CFP first helped formulate strategic points of departure, and on the basis of these, defined steps to be taken for improvement. This led to the implementation of follow-up projects in energy savings and main contracting of maintenance in the company restaurant and the copy centre. In the energy savings project, CFP analysed the control engineering and the combined heat and power (CHP), the potential replacement of old systems with energy-efficient ones, and sustainable methods for generating energy. The main contract bundles dozens of maintenance service suppliers in one contract. For the company restaurant, the possibility of working with unmanned checkout counters was studied, and purchasing of ingredients was optimised. In the copy centre, insourcing options were looked into, and purchasing was optimised.
Download PDF